Installed Capacity At Glance :
INSTALLED CAPACITY

SL.No.

Power Station

Installed Capacity (MW)

M P SHARE
(MW)
1 Amarkantak Extn (210 MW)  210 210
2 Satpura II (200+210 MW)  410 410
3 Satpura III (2x210 MW)  420 420
4 Satpura IV (2x250 MW)  500 500
5 Sanjay Gandhi, Birsinghpur -I (2x210 MW)  420 420
6 Sanjay Gandhi Birsinghpur -II (2x210 MW)  420 420
7 Sanjay Gandhi Birsinghpur -Extn (1x500 MW) 500 500
8 Shri Singaji TPS Dongalia (2x600 MW) 1200 1200
Total Thermal Power Station Generation 4080 4080
1 Gandhi Sagar(5x23 MW)  115 57.5
2 Pench,Totladoh(2x80 MW) 160 107
3 Rani Awanti Bai Bargi (2x45 MW) 90 90
4 Ban Sagar I Tons(3x105 MW) 315 315
5 Birsinghpur(1x20 MW) 20 20
6 Rajghat (3x15 MW) 45 22.5
7 Ban Sagar II Silpara(2x15 MW) 30 30
8 Bansagar -III  Deolond (3x20 mW) 60 60
9 Bansagar -IV  Jhinna (2x10 MW) 20 20
10 Madhikheda (3x20 MW) 60 60
Jawaharsagar & Ranapratapsagar Station of Rajasthan (99MW & 172 MW), 50% of 271MW  ---- 135.5
  Total Hydro Power Station Generation 915 917.5
  Total 4995 4997.5